August 2006
No Leakage at Leftbank
By:- Martin Radford, National
Sales & Marketing Manager RIW
has provided podium deck waterproofing at Leftbank,
a newly built residential development within the Spinningfields
area of Manchester.
Designed by architect Aedas AHR and
developed by AMEC, the one, two and three bedroom apartments
within Manchester’s new business quarter will
significantly aid the regeneration in the area.
RIW’s waterproofing
product Flexiseal
was used on the podium
deck between the various buildings, which
will form the roof of the basement car park. The waterproofing,
applied by Cast
Contracting Ltd, is essential to protect
the concrete deck and to prevent water ingress through
the deck, which could potentially damage the vehicles
parked below.
Flexiseal
is a high performance membrane that when applied forms
a seamless, fully bonded, colour coded and robust waterproofing
system. The waterproofing can be easily applied to all
the critical areas such as internal and external corners,
gully outlets and building interfaces, which are traditionally
difficult to waterproof.
RIW’s Flexiseal
can be applied by hand avoiding the necessity to protect
expensive glazing panels from overspray, and by spray
allowing large areas to be installed quickly and accurately
in critical areas.
Spinningfields is a stylish, sweeping
urban development complete with spacious boulevards
and walkways with views over the River Irwell. As well
as Leftbank’s residential apartments, Spinningfields
will also include offices, luxury hotels, shops, restaurants
and bars.
|